|
Project #14: Replace existing
covered porch into downstairs restroom
Paul and his wife need a
restroom downstairs. This job is large and will take considerable construction
knowledge. Approx 12-15 people can work on this project all week.
You will tear old floor off porch and start floor from there. Use
porch roof for bath roof. Remove one window in bedroom for access to
bath. She is in a wheelchair and he is on oxygen.
Skills needed:
construction, plumbing
Click here for a printable project sheet (including tool checklist).
Click here for a material AND tool list.
**Please note: It is
your responsibility to let us know which tools you will bring. You
are not required to bring every tool on the list, but letting us
know at least TWO weeks before your arrival will assist us in
having the necessary tools available. This is just another step in
helping make your mission trip as organized as we can. Thank you for
your assistance!
[Click on a thumbnail
for a larger view]
|